MBR System Upgrade

MBR System Upgrade | 0.04 MGD

Jellystone WWTP, CO

intall time

24 HRS

2024 project overview​

Project Category : Retrofit

Project Type : System Components

Scope : Turnkey

Previous Membrane : OVIVO (Flat Plate, SiC)

Installed Membrane : Toray NHP (Flat Sheet, Polymeric)

Status : Operational

DESCRIPTION

Jellystone Park, a campground in the Colorado mountains, treats wastewater onsite with a package MBR system. After nearly two years of poor performance with silicon carbide membranes, the owner brought in MMBR to restore capacity and uptime. Before the upgrade, operators were hauling wastewater to a nearby facility to keep up with demand.

MMBR delivered a turnkey retrofit with polymeric membranes, operator training, and post-startup support. This emergency retrofit, restored treatment capacity, improved reliability, and ended the need for hauling.

The membrane portion of the upgrade took approximately 24-hrs. Downtime and remediation were coordinated with plant operators to minimize service disruptions.

For nearly 2 years our plant had operational issues. After the upgrade, that took about 2 weeks, and with MMBR’s help, the plant has been running great.
Clyde Parker
Jellystone, CO

HIGHLIGHTS

Project History :
Conversion (2024), Expansion (2025), Parts Supply (2026)
Wastewater Type(s) :
Commercial
Application(s) :
RV Park
Discharge Type(s) :
Discharge + Reuse

Looking to optimize your MBR Plant ?

Talk with an MBR expert.

Sidebar Contact Form
MMBR Systems digital dashboard displayed on a tablet with stylus for data management.

MBR Plant Health Assessments

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.