MBR Upgrade

MBR Upgrade | 1.90 MGD

Ballina WRP, Australia

intall time

20 DAYS

2025 project overview​

Project Category : Retrofit

Project Type : MBR Expansion

Scope : Membrane Equipment

Previous Membrane : Kubota RW-400 SMU (Flat Plate, Polymeric)

Installed Membrane : Toray NHP (Flat Sheet, Polymeric)

Status : Operational

DESCRIPTION

Ballina’s regional Water Reclamation Plant (WRP) serves a growing coastal municipality in Australia. To meet rising demand and improve reuse quality, the existing MBR system was expanded from 1.5 MGD to 1.9 MGD and converted from microfiltration (MF) to ultrafiltration (UF) membranes.

Working with local integrator Hydroflux, and the manufacturer, MMBR Systems delivered 36 backward-compatible TORAY-based membrane units for four basins. The new modules dropped into place over existing diffusers and used the same blowers, allowing each basin to be converted in about five days, or 20 days total.

MMBR supported the design, fabrication, and installation, of the replacement membrane equipment. Our team also provided remote monitoring and optimization services.

M|MBR is a trusted partner. They have a proven track record of successful MBR aftermarket and retrfoit projects.
Ben Freeman
Toray Membrane

HIGHLIGHTS

Project History :
Conversion (2025)
Wastewater Type(s) :
Municipal Wastewater
Application(s) :
Residential
Discharge Type(s) :
Reuse + Discharge

Looking to optimize your MBR Plant ?

Talk with an MBR expert.

Sidebar Contact Form
MMBR Systems digital dashboard displayed on a tablet with stylus for data management.

MBR Plant Health Assessments

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.