Project Category : Aftermarket
Project Type : Membrane Products (Part-for-Part)
Scope : Turnkey
Previous Membrane : Kubota ES-100 SMU (Flat Plate, Polymeric)
Installed Membrane : Toray NHP (Flat Sheet, Polymeric)
Status : Operational
Owned by TxDOT, this Richland Creek rest-area WWTP is designed for 100% reuse or creek discharge. M|MBR staff supported the delivery of the original greenfield project in 2011.
When aging flat-plate membranes needed replacement in 2020, we delivered a cost-effective upgrade using compatible Toray NHP flexible flat-sheet modules.
The cassette-level, drop-in replacement required no changes to ancillary equipment and was installed in a single day.
M|MBR handled site assessment, design, installation, and commissioning, demonstrating how even small facilities can benefit from low-risk, life-extension services.
Project History :
Greenfield (2011), Parts Supply (2021)
Wastewater Type(s) :
Municipal
Application(s) :
Rest Stop
Discharge Type(s) :
Reuse + Discharge

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.