Project Category : Aftermarket
Project Type : System Components
Scope : Turnkey
Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric)
Installed Membrane : MYTEX (Flat Sheet, Polymeric)
Status : Operational
Members of M|MBR have supported the Running Springs WRF since a 2003 CAS upgrade that extended tank service life, expanded capacity, and improved treatment. Over 23 years, the team helped deliver multiple improvements, including a 2017 expansion from 0.60 to 1.04 MGD.
In 2022, M|MBR recommended MYTEX technology to increase oxygen transfer, widen the mixed liquor suspended solids (MLSS) operating window, improve uptime, and simplify maintenance.
Working with the operators, M|MBR managed the turnkey upgrade in about 10 days, handling design, logistics, installation, controls, and commissioning.
Project History :
Conversion (2003), Expansion (2017), Parts Supply (2025)
Wastewater Type(s) :
Municipal
Application(s) :
Residential
Discharge Type(s) :
Reuse + Discharge

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.