Project Category : Aftermarket
Project Type : Membrane Products (Part-for-Part)
Scope : Turnkey
Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric)
Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric)
Status : Operational
Stony Point WWTP, one of Texas’s first packaged MBR plants, was originally delivered in 2007 with M|MBR team support and later converted to flexible flat-sheet membranes.
In 2025, after approximately 18 years of plant operation, the modules reached end of service earlier than planned. M|MBR responded within days with backward-compatible replacement equipment from local inventory.
Technicians worked with plant operators to complete a four-module changeout in 17 hours during a rain event.
The plant quickly returned to design performance, with improved operability and reliability.
Project History :
Greenfield (2007), Parts Supply (2025)
Wastewater Type(s) :
Municipal
Application(s) :
Residential
Discharge Type(s) :
Discharge

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.