Ballina WRP | 1.90 MGD

Industrial water treatment facility with engineers inspecting equipment and large crane in backgroun.

MBR Upgrade Home MBR Upgrade Case Study MBR Upgrade | 1.90 MGD Ballina WRP, Australia intall time 20 DAYS 2025 project overview​ Project Category : Retrofit Project Type : MBR Expansion Scope : Membrane Equipment Previous Membrane : Kubota RW-400 SMU (Flat Plate, Polymeric) Installed Membrane : Toray NHP (Flat Sheet, Polymeric) Status : Operational […]

St. Paul WWTP | 0.50 MGD

Industrial water treatment facility with workers installing equipment at MMBR Systems site.

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.50 MGD St. Paul WWTP, VA intall time 24 HRS 2025 project overview​ Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : BIO-CEL 416 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status […]

Angel of the Winds WWTP | 0.12 MGD

Elevator system installation at MMBR Systems facility for industrial automation.

MBR System Upgrade Home MBR Upgrade Case Study MBR System Upgrade | 0.12 MGD Angel of the Winds WWTP, WA intall time 8 HRS 2024 project overview​ Project Category : Aftermarket Project Type : System Components Scope : Turnkey Previous Membrane : BIO-CEL L2 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) […]