Membranes are not the only part of an MBR plant with a service life. The PLC, the HMI and the software behind them age faster than the mechanical equipment around them, and they age quietly. Most operators do not think about the control system at all until the day it stops them doing something they need to do.
Dale Tafoya
Operator
Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.
|
Component
|
From
|
To
|
Why
|
|---|---|---|---|
|
PLC hardware
|
CompactLogix 1769-L35E
|
1769-L36ER
|
Required to run current Studio 5000
|
|
PLC software
|
Logix 5000 v.19
|
Studio 5000 v.36
|
Older versions need Windows 10 or earlier
|
|
HMI software
|
Wonderware
|
RSView SE
|
Customer Standard
|