MBR Modular System

BLU|BOX MBR Purchase

0.20 MGD

Modular WWTP #1, TX

inStall time

7 months

Picture is for illustration purposes only and may not be from the specific site.

2026 project overview​

Project Category : Modular System, BLU|BOX MBR

Project Type : Greenfield

Scope : Turnkey

Installed Membrane : MANN+HUMMEL BIO-CEL L+ (Polymeric, Flat Sheet)

Status : Operational

DESCRIPTION

A Central Texas developer needed a flexible wastewater treatment solution to match the growth of a new residential subdivision. To optimize capital expenditure, the project required a phased delivery that could easily scale from initial home construction to full buildout.

Integrated Water Services (IWS) delivered a scalable, turnkey membrane bioreactor (MBR) solution using three modular BLU|BOX-75 units. In Phase 1, IWS installed the first BLU|BOX-75 unit, providing an initial design capacity of 60,000 GPD to serve early residents. In Phases 2 & 3 (the Expansion), approximately two years later, IWS delivered and integrated two additional BLU|BOX-75 units during a 7-month project, bringing total plant capacity to the permitted 200,000 GPD.

All three BLU|BOX-75 units were built at the MBR Tech Hub in Brenham, TX. System startup and long-term maintenance are supported directly by regional technicians from our local MBR Tech Hub facilities.

As an experienced - and engagingly impartial and self-effacing - practitioner in the field of MBR technology, Dennis seems to know heaps more about the subject than most of the senior academics I’ve met over the course of the past 25 years.
Simon Judd
World Renowned MBR Expert

HIGHLIGHTS

Project History :
Greenfield (2024), Expansion (2026)
Wastewater Type(s) :
Municipal
Application(s) :
Residential
Discharge Type(s) :
Surface Water Discharge

Looking to optimize your MBR Plant ?

Talk with an MBR expert.

Sidebar Contact Form
MMBR Systems digital dashboard displayed on a tablet with stylus for data management.

MBR Plant Health Assessments

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.