MBR Membrane Upgrade | 4.0 MGD
Pikeville WWTP, KY
Project Category : Aftermarket
Project Type : System Components
Scope : Turnkey
Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric)
Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric)
Status : Operational
DESCRIPTION
The Pikeville wastewater treatment plant (WWTP) is a municipal facility in eastern Kentucky serving residential and light industrial flows under strict permit limits. As the installed membranes approached end of service life, M|MBR installed 56 new modules across four of the five reactors in about 12 days, coordinating closely with operations and the membrane manufacturer to minimize service interruptions. The actual time to install 14 units into each tank was about 30 hours (120 hours total) or two hours per membrane module. M|MBR supported logistics, inspection, installation, and full-load testing requirements. The modernized system now operates reliably at full capacity, with lower maintenance costs and proven performance even during exceptionally cold winter conditions.
Disclaimer : Results described are specific to the site and conditions shown and are not a guarantee of performance; contract documents govern any supply. Install time refers to the membrane changeout unless stated otherwise. Project history may include work performed by members of the M|MBR team before the formation of M|MBR Systems LLC. Testimonials reflect the views of the individuals at the time given; some are from M|MBR supply and integration partners. Photos may be illustrative. Kubota, Ovivo, ZeeWeed, Toray, BIO-CEL, MYTEX, Supratec and CROM are trademarks of their respective owners, used for identification only. M|MBR Systems is independent of, and not affiliated with or endorsed by, those companies.