MBR Membrane Upgrade

MBR Membrane Upgrade | 1.04 MGD

Running Springs WRF, CA

Install time

10 Days

2025 PROJECT OVERVIEW

Project Category : Aftermarket

Project Type : System Components

Scope : Turnkey

Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric)

Installed Membrane : MYTEX (Flat Sheet, Polymeric)

Status : Operational

DESCRIPTION

Members of M|MBR have supported the Running Springs WRF since a 2003 CAS upgrade that extended tank service life, expanded capacity, and improved treatment. Over 23 years, the team helped deliver multiple improvements, including a 2017 expansion from 0.60 to 1.04 MGD.

In 2022, M|MBR recommended MYTEX technology to increase oxygen transfer, widen the mixed liquor suspended solids (MLSS) operating window, improve uptime, and simplify maintenance.

Working with the operators, M|MBR managed the turnkey upgrade in about 10 days, handling design, logistics, installation, controls, and commissioning.

I have nothing but good things to say about MMBR.
Tom Shoopman
Wastewater Division CPO
Disclaimer : Results described are specific to the site and conditions shown and are not a guarantee of performance; contract documents govern any supply. Install time refers to the membrane changeout unless stated otherwise. Project history may include work performed by members of the M|MBR team before the formation of M|MBR Systems LLC. Testimonials reflect the views of the individuals at the time given; some are from M|MBR supply and integration partners. Photos may be illustrative. Kubota, Ovivo, ZeeWeed, Toray, BIO-CEL, MYTEX, Supratec and CROM are trademarks of their respective owners, used for identification only. M|MBR Systems is independent of, and not affiliated with or endorsed by, those companies.

HIGHLIGHTS

Project History :
Conversion (2003), Expansion (2017), Parts Supply (2025)
Wastewater Type(s) :
Municipal
Application(s) :
Residential
Discharge Type(s) :
Reuse + Discharge

Looking to optimize your MBR Plant ?

Talk with an MBR expert.

Sidebar Contact Form
MMBR Systems digital dashboard displayed on a tablet with stylus for data management.

MBR Plant Health Assessments

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.