MBR Membrane Replacement

MBR Membrane Replacement

< 0.05 MGD

Small WWTP #2, MA

inStall time

8 HRS

Picture is for illustration purposes only and may not be from the specific site.

2025 project overview​

Project Category : Aftermarket

Project Type : Membrane Products (Part-for-Part)

Scope : Turnkey

Previous Membrane : ZeeWeed (Hollow Fiber, Polymeric)

Installed Membrane : Supratec (Hollow Fiber, Polymeric)

Status : Operational

DESCRIPTION

M|MBR maintains an ongoing partnership with a regional engineering and operations firm, serving as a distributor and technical resource across multiple MBR projects. For this application, M|MBR specified and supplied a membrane solution that was backward compatible with existing equipment. The new product has a wider operating range than the older product and is designed for seamless installation. No system or operational changes were required. It was a part-for-part replacement. This simple, aftermarket project broke the OEM lock and created sourcing options to help ensure cost-effective, reliable operations for the life of the plant.
As an experienced - and engagingly impartial and self-effacing - practitioner in the field of MBR technology, Dennis seems to know heaps more about the subject than most of the senior academics I’ve met over the course of the past 25 years.
Simon Judd
World Renowned MBR Expert

HIGHLIGHTS

Project History :
Parts Supply (2025)
Wastewater Type(s) :
Municipal
Application(s) :
School
Discharge Type(s) :
Discharge

Looking to optimize your MBR Plant ?

Talk with an MBR expert.

Sidebar Contact Form
MMBR Systems digital dashboard displayed on a tablet with stylus for data management.

MBR Plant Health Assessments

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.