MBR Membrane Replacement

MBR Membrane Replacement | 0.13 MGD

Stony Point WWTP, TX

intall time

17 HRS

2025 project overview​

Project Category : Aftermarket

Project Type : Membrane Products (Part-for-Part)

Scope : Turnkey

Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric)

Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric)

Status : Operational

DESCRIPTION

Stony Point WWTP, one of Texas’s first packaged MBR plants, was originally delivered in 2007 with MMBR team support and later converted to flexible flat-sheet membranes.

After more than two decades in service, the modules failed unexpectedly in 2025. MMBR responded within days with backward-compatible replacement equipment from local inventory.

Technicians worked with plant operators to complete a 4-module changeout in 17 hours during a rain event. The plant quickly returned to design performance, with improved operability and reliability.

The M|MBR team delivered 4 new membrane units in less than a week and helped to get them installed in 17-hrs. It was an emergency and the M|MBR team was there with us to get the plant back online. After the replacement, plant capacity was fully restored and performance improved
James Elam, Operations Area Manager

HIGHLIGHTS

Project History :
Greenfield (2007), Parts Supply (2025)
Wastewater Type(s) :
Municipal
Application(s) :
Residential
Discharge Type(s) :
Discharge

Looking to optimize your MBR Plant ?

Talk with an MBR expert.

Sidebar Contact Form
MMBR Systems digital dashboard displayed on a tablet with stylus for data management.

MBR Plant Health Assessments

Comprehensive membrane bioreactor inspections with detailed scoring, photo documentation, and actionable recommendations for your facility.