Small WWTP #1 | <0.05 MGD

Industrial wastewater treatment system with aeration tanks and piping.

Home MBR Cases Studies MBR Membrane Replacement MBR Membrane Replacement < 0.05 MGD Small WWTP #1, MA inStall time 8 HRS Picture is for illustration purposes only and may not be from the specific site. 2026 project overview​ Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : […]

Small WWTP #4 | <0.05 MGD

Industrial wastewater treatment system with aeration tanks and piping.

Home MBR Cases Studies MBR Membrane Replacement MBR Membrane Replacement < 0.05 MGD Small WWTP #4, CT inStall time 8 HRS Picture is for illustration purposes only and may not be from the specific site. 2026 project overview​ Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : […]

Hays County WWTP | 0.50 MGD

High-capacity water treatment system with filtration panels at MMBR Systems facility.

MBR System Upgrade Home MBR Upgrade Case Study MBR System Upgrade | 0.50 MGD Hays County WWTP, TX intall time 48 HRS 2026 project overview​ Project Category : Aftermarket Project Type : Membrane Replacement (Part-for-Part) Scope : Turnkey Previous Membrane : Kubota RW-400 SMU (Flat Plate, Polymeric) Installed Membrane : Toray NHP (Flat Sheet, Polymeric) […]

Chuckchansi Gold Resort & Casino WWTP | 0.25 MGD

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.25 MGD Chuckchansi Gold Resort & Casino WWTP, CA intall time 24 HRS 2025 project overview​ Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : Kubota EK-300 SMU (Flat Plate, Polymeric) Installed Membrane : Toray […]

Ballina WRP | 1.90 MGD

Industrial water treatment facility with engineers inspecting equipment and large crane in backgroun.

MBR Upgrade Home MBR Upgrade Case Study MBR Upgrade | 1.90 MGD Ballina WRP, Australia intall time 20 DAYS 2025 project overview​ Project Category : Retrofit Project Type : MBR Expansion Scope : Membrane Equipment Previous Membrane : Kubota RW-400 SMU (Flat Plate, Polymeric) Installed Membrane : Toray NHP (Flat Sheet, Polymeric) Status : Operational […]

St. Paul WWTP | 0.50 MGD

Industrial water treatment facility with workers installing equipment at MMBR Systems site.

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.50 MGD St. Paul WWTP, VA intall time 24 HRS 2025 project overview​ Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : BIO-CEL 416 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status […]

Angel of the Winds WWTP | 0.12 MGD

Elevator system installation at MMBR Systems facility for industrial automation.

MBR System Upgrade Home MBR Upgrade Case Study MBR System Upgrade | 0.12 MGD Angel of the Winds WWTP, WA intall time 8 HRS 2024 project overview​ Project Category : Aftermarket Project Type : System Components Scope : Turnkey Previous Membrane : BIO-CEL L2 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) […]