Small WWTP #1 | <0.05 MGD

Industrial wastewater treatment system with aeration tanks and piping.

Home MBR Case Studies MBR Membrane Replacement MBR Membrane Replacement <0.05 MGD Small WWTP #1, MA Install time 8 hrs Picture is for illustration purposes only and may not be from the specific site. 2026 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : ZeeWeed […]

Small WWTP #4 | <0.05 MGD

Industrial wastewater treatment system with aeration tanks and piping.

Home MBR Case Studies MBR Membrane Replacement MBR Membrane Replacement <0.05 MGD Small WWTP #4, CT Install time 8 hrs Picture is for illustration purposes only and may not be from the specific site. 2026 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : ZeeWeed […]

Hays County WWTP | 0.50 MGD

High-capacity water treatment system with filtration panels at MMBR Systems facility.

MBR System Upgrade Home MBR Upgrade Case Study MBR System Upgrade | 0.50 MGD Hays County WWTP, TX Install time 48 hrs 2026 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : Kubota RW-400 SMU (Flat Plate, Polymeric) Installed Membrane : Toray NHP (Flat Sheet, Polymeric) […]

Chukchansi Gold Resort & Casino WWTP | 0.25 MGD

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.25 MGD Chukchansi Gold Resort & Casino WWTP, CA Install time 24 HRS 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : Kubota EK-300 SMU (Flat Plate, Polymeric) Installed Membrane : Toray […]

Ballina WRP | 1.90 MGD

Industrial water treatment facility with engineers inspecting equipment and large crane in backgroun.

MBR Upgrade Home MBR Upgrade Case Study MBR Upgrade | 1.90 MGD Ballina WRP, Australia Install time 20 Days 2025 PROJECT OVERVIEW Project Category : Retrofit Project Type : MBR Expansion Scope : Membrane Equipment Previous Membrane : Kubota RW-400 SMU (Flat Plate, Polymeric) Installed Membrane : Toray NHP (Flat Sheet, Polymeric) Status : Operational […]

St. Paul WWTP | 0.50 MGD

Industrial water treatment facility with workers installing equipment at MMBR Systems site.

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.50 MGD St. Paul WWTP, VA Install time 24 hrs 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : BIO-CEL 416 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status […]

Angel of the Winds WWTP | 0.12 MGD

Elevator system installation at MMBR Systems facility for industrial automation.

MBR System Upgrade Home MBR Upgrade Case Study MBR System Upgrade | 0.12 MGD Angel of the Winds WWTP, WA Install time 8 hrs 2024 PROJECT OVERVIEW Project Category : Aftermarket Project Type : System Components Scope : Turnkey Previous Membrane : BIO-CEL L-2 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) […]