Modular WWTP #1 | 0.20 MGD

Modular wastewater treatment plant with tanks and equipment in an open area.

Home MBR Case Studies BLU|BOX MBR Purchase BLU|BOX MBR Purchase 0.20 MGD Modular WWTP #1, TX Install time 7 Months Picture is for illustration purposes only and may not be from the specific site. 2024 PROJECT OVERVIEW Project Category : Modular System, BLU|BOX MBR Project Type : Greenfield Scope : Turnkey Installed Membrane : BIO-CEL […]

McKinney Roughs WWTP | 0.25 MGD

Aerial view of modular MBR wastewater treatment tanks at NXTMBR site.

Home MBR Case Studies MBR Plant Replacement MBR Plant Replacement 0.25 MGD McKinney Roughs WWTP, TX Install time 7 Months Picture is for illustration purposes only and may not be from the specific site. 2024 PROJECT OVERVIEW Project Category : Modular System Project Type : Greenfield Scope : Turnkey Installed Membrane : BIO-CEL L+ (Polymeric, […]

Small WWTP #5 | <0.05 MGD

Technicians installing water treatment equipment at a wastewater plant.

Home MBR Case Studies MBR Membrane Replacement MBR Membrane Replacement <0.05 MGD Small WWTP #5, MA Install time 8 hrs Picture is for illustration purposes only and may not be from the specific site. 2026 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : ZeeWeed […]

Small WWTP #3 | <0.05 MGD

Industrial wastewater treatment system with aeration tanks and piping.

Home MBR Case Studies MBR Membrane Replacement MBR Membrane Replacement <0.05 MGD Small WWTP #3, CT Install time 8 hrs Picture is for illustration purposes only and may not be from the specific site. 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : ZeeWeed […]

Yakama WWTP | 0.36 MGD

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.36 MGD Yakama, WA Install time 24 hrs 2025 PROJECT OVERVIEW Project Category : Retrofit Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : BIO-CEL 416 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status : Operational […]

Resort WWTP | 0.10 MGD

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.10 MGD Resort WWTP, USVI Install time 8 hrs 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Equipment Only Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status […]

Small WWTP #2 | <0.05 MGD

Technicians installing water treatment equipment at a wastewater plant.

Home MBR Case Studies MBR Membrane Replacement MBR Membrane Replacement <0.05 MGD Small WWTP #2, MA Install time 8 hrs Picture is for illustration purposes only and may not be from the specific site. 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : ZeeWeed (Hollow […]

Stony Point WWTP | 0.13 MGD

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.13 MGD Stony Point WWTP, TX Install time 17 hrs 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status […]

Santa Ana WWTP | 0.50 MGD

High-capacity industrial water treatment system with large metal tanks and piping for efficient filt.

MBR Membrane Replacement Home MBR Upgrade Case Study MBR Membrane Replacement | 0.50 MGD Santa Ana WWTP, NM Install time 24 hrs 2022 PROJECT OVERVIEW Project Category : Aftermarket Project Type : Membrane Products (Part-for-Part) Scope : Turnkey Previous Membrane : BIO-CEL L-2 (Flat Sheet, Polymeric) Installed Membrane : BIO-CEL L+ (Flat Sheet, Polymeric) Status […]

Running Springs WRF | 1.04 MGD

Industrial water treatment system with multiple filtration units at a facility.

MBR Membrane Upgrade Home MBR Upgrade Case Study MBR Membrane Upgrade | 1.04 MGD Running Springs WRF, CA Install time 10 Days 2025 PROJECT OVERVIEW Project Category : Aftermarket Project Type : System Components Scope : Turnkey Previous Membrane : BIO-CEL 480 (Flat Sheet, Polymeric) Installed Membrane : MYTEX (Flat Sheet, Polymeric) Status : Operational […]